Sunday, November 24, 2019

Horkstow Bridge



Horkstow Bridge - a suspension bridge that spans the New River Ancholme. Designed by Sir John Rennie in 1836 as part of the River Ancholme Drainage Scheme.  Built to cross the New River Ancholme to give access to the brick kilns that ran along the bank. It is one of the earliest surviving suspension bridges in the country and is now a Grade II* listed building. 

Saturday, November 23, 2019

Bittern, Far Ings NNR, Barton upon Humber















Just got the lid off the flask and the biscuits opened and out walked a bittern.....and there it stood !  An excellent couple of hours.

Monday, November 18, 2019

Great Northern Diver and Red Throated Diver, Scarborough Harbour








Great Northern Diver today in Scarborough Harbour 







Red Throated Diver also in Scarborough Harbour 
An excellent day, lots of blue sky and no rain !! 
Felt good to get out and about after the week of non-stop rain and flooding. 

Saturday, November 16, 2019

Whooper Swans


Our first day of the floods gave us 4 Whooper Swans......we are now nearly into a week of the rain and thinking of building an ark ....enough !!

Scaup, Barton





Scaup and Tufted Ducks on one of the pits at Barton 

Great-crested Grebe 

and a Kingfisher - not from a hide with strategically placed perches and listening to folk chatting about short-eared owls and camera F stops !

Saturday, November 9, 2019

Local flooding today

The River Eau running through Scotter. Usually resembles a stream.....today looks like the Trent ! All nearby houses now totally flooded but not a sandbag in sight ?  The floods drew quite a crowd, the police shut the roads and a rescue boat was launched to fetch all the people stranded.  We will never live near water !








River Torne, just clearing the bridge. Pumps going 24/7 !